Baish Dam - Kingdom of Saudi Arabia

After consultation with Ministry Engineers, Geosense designed a system installing new instruments side by side with the existing instrumentation and upgrading several areas to provide a fully-integrated and automatic dam safety monitoring system.

View PDF

Kashimbila Dam - Nigeria

Geosense has recently supplied instrumentation during construction of a new multi-purpose 40 Megawatt dam in Taraba State, Nigeria.

View PDF

Shahdag Tourism Complex - Azerbaijan

The most critical section of this tourism complex is the 24m high earth dam to create a reservoir for water storage to provide a continuous supply for snow production. A monitoring system was required for both construction control and the long-term performance and overall stability of the reservoir.

View PDF

Ziezoun Dam - Syria

As part of the re-building program a new design with an extensive monitoring system is currently being implemented. The new dam design includes a much deeper foundation which is intended to remove the weak strata identified as part of the reason for the failure. Geosense instrumentation was used to monitor the dam integrity by monitoring key areas.

View PDF

Tishreen Dam - Syria

Due to a serious dam failure in Syria the General Organisation for Euphrates Dam (GOED) decided to upgrade the instrumentation. Geosense designed a system installing new instruments side by side with the existing instrumentation and upgrading several areas to provide a fully integrated and automatic dam safety monitoring system.

View PDF

Chemususu Dam - Kenya

Chemususu Dam, completed in 2014, is now the third largest dam in Kenya. Geosense instrumentation was used in monitoring the dam construction integrity and long-term safety.

View PDF

Al Abyad Dam - Syria

Monitoring of the dam construction integrity and long term safety was carried out by recording measurements using Geosense instrumentation.

View PDF